As of today Phase III of construction on the Manitou Incline has reached 90% complete! As long as we do not experience significant weather delays the trail will reopen on December 1st, 2017.
All retaining walls and water chases are finished. The tie steps have been placed and bracketed. Our next steps will be to add the cable that will attach to each step and lay erosion control netting along the sides of the trail. Care has been taken with the layout of steps to ensure that the trail is still a very difficult climb.